DIY Changeover Streamline - SMED
Changeovers seem like a necessary evil and just a fraction of your day. Shouldn’t we speed up our production process rather than our setup? Why would we bother?
A machine that earns $150 an hour pays you nothing while it waits for an operator walking to the store room for a tool. Six minutes a trip, five trips a shift, and you lose $75 every shift. Over 240 shifts that is $18,000 a year just in lost production time.
Good News!
You can get most of that back for a fraction of the cost.
Tips:
🚀 Put a second set of tools on a changeover shadow board with wheels. It rolls right up to the operator's right hand. Zero steps to the next wrench.
🚀 Deliver parts and tools to the point of use. The operator runs the machine; someone else runs the errands.
🚀 Make stop gauges and shims for setups you repeat. A bent, broken tape measure is a poor gauge for the fortieth job.
🚀 Add a quick Andon so maintenance sees the problem in seconds. Your maintenance guys are hard to reach. Don't make your machinist go find them.
🚀 Allow the operator to clear the routine "Cache error" or whatever is the typical standstill. If it happens every week, it is part of the job; it should not need a maintenance ticket.
Plan tomorrow's changeover today, and the machine keeps earning while everyone else looks for the tape measure.
Get started!
Turn the needed setup tools and materials into a nice little care package.
- Factory Physicians -
Here to help with this and MORE!
Move a few tasks around so you can better utilize your machine’s uptime.